Just after midnight, tones began to drop for the working box in Loyalsock Township Box 18-0 bringing Squad 5 to the scene. Squad responded with 4. When crews arrived, we were tasked with the Working RIT Group. Crews were working on laddering the building when one member was pulled to assist with Vertical Ventilation and another as a backup to a secondary line. Chief 5 requested the next in company to take up the RIT task as his team was being pulled to aid in suppression efforts. Fire was brought down and controlled within 20 minutes of arrival.